For your information, the following is a list of “Key” activities that will be occurring around the site over the next couple of weeks.
- Paramount:
- Villas window install continues
- Villa area Amenity deck construction continues
- NE 1 Ave between NE 8th and NE 9th Sidewalk closure – paver replacement at Garage entry for
- Dates: 02/10/20 – 02/15/20
- Times: 08:00 AM – 04:00 PM
- Work by Others – Allegiance Crane for the NAP (Not by CoastalTishman)
- Two lane closure on NE 1 Ave. between NE 8th and NE 9th Street
- Dates: 02/10/20, 02/17/20 and 02/24/20
- Time: 10:00 PM to 06:00 AM
- Two lane closure on NE 1 Ave. between NE 8th and NE 9th Street
- D East
- Sidewalk partially closed on NE 2nd Ave. (West Side)
- Dates: 02/03/20 to 02/14/20
- Time: 12:00AM to 06:00AM
- Sidewalk partially closed on NE 2nd Ave. (West Side)
- MWC Luma
- Tower
- Forming and pouring verticals – daytime
- Forming Slabs – daytime
- Pouring Slabs
- FRP Verticals at Garage
- MEP Installation
- Tower