For your information, the following is a list of “Key” activities that will be occurring around the site over the next couple of weeks.
- Paramount:
- Villas and Level 7 Amenity deck continues
- Luma Tower:
- Interior build outs and stocking of building materials with the buck hoists
- Stucco and paint on the exterior on swing stages on the tower and the garage
- Pool deck construction
- Roofing on Block H
- Roof top build out including mechanical work on the Luma tower roof
- One lane Closure:
– Location: NE 1 Ave between NE 5 and 8 Street
– Dates: 11/16/20 thru 12/04/20