For your information, the following is a list of “Key” activities that will be occurring around the site over the next couple of weeks.
- Paramount:
- Amenity deck waterproofing and installation of swimming pools continue.
- Window installation continues.
- Elevator bracket and rail installation is ongoing.
- Interior Finishes continue.
- North and South Hoist removal will commence.
- Partial Lane Closure on NE 10th St. between NE 1st Ave and NE 2nd Ave.:
- Duration: 01/20/19 – 02/20/19
- Time: from 7:30 AM to 6:30 PM
- 7th Street Apartments Project:
- Interior Punchout continues.
- Façade panels install continues.
- Final Painting
- Completion of Dog walk in garage area.
- Block D East:
- Elevators Installation is ongoing.
- Doors and door frames installations continue.
- Installation Façade Metal panels and sub framing on the south elevation.
- Installation of the steel supporting members for the louvers.
- Installation of the temporary walls continues.
- Off-site utilities installation along 8th St. continues.
- Site Work:
- Partial Closure on NE 8th St. Between NE 1st and NE 2nd Ave due to Gas line installation.
- Time: 8AM to 4PM
- Duration 02/11/2019 to 02/15/2019
- Partial Closure on NE 1st Ave. Between NE 1st from NE 8th to 10th St (East Half Road Reconstruction). Traffic will be reduced to 1 lane.
- Time: 24 HRS
- Duration: 02/18/19 – 03/29/19
- Partial Closure on NE 8th St. Between NE 1st and NE 2nd Ave due to Gas line installation.
- Site Utilities
- Road Reconstruction to begin at NIGHT along NE 1st Ave from NE 8th ST to NE 10th ST (East Half of Road)
- Monday 02.18.19 to Friday 03.08.19
- Traffic along NE 1st Ave will be reduced to One Lane
- Road Reconstruction to begin at NIGHT along NE 1st Ave from NE 8th ST to NE 10th ST (East Half of Road)
NOTE: All Concrete pours anticipated to start at 1am.