For your information, the following is a list of “Key” activities that will be occurring around the site over the next couple of weeks.

1. Paramount:

a. Villa area Amenity deck construction continues

b. NE 1 Ave between NE 8th and NE 9th Sidewalk closure – paver replacement at Garage entry for Paramount.

• Dates: 03/02/20 – 03/15/20

• Times: 08:00 AM – 04:00 PM

2. MWC Luma

a. Tower / Garage

• Forming and pouring verticals – daytime

• Concrete Slab Pours start at 04:00 AM

• FRP Verticals at Garage

• MEP Installation Underground

• Block installation on L1 of both the garage and the tower

• Window Installation, MEP rough in and framing continues

956906 956907 956908 956909 956913 956914 956916