Construction Update Week of July 8, 2019

For your information, the following is a list of “Key” activities that will be occurring around the site over the next couple of weeks.

1. Paramount:

a. Partial Lane Closure on NE 8th St. corner with 1st Ave.

• Duration: 07/15/19 – 07/30/19

• Time: from 7:30 AM to 6:30 PM

b. Partial Lane closure; most eastern lanes on 1st Ave. between NE 8th and NE 10th Street

• Duration: 05/01/19 – 08/02/19

• Time: 7:30 AM to 6:00 PM

c. Interior finishes continue

d. Amenity deck continues

2. Block D East:

a. Amenity deck continues

b. Installation of the metal fins started on the north elevation

c. Off-site utilities installation along 2nd Avenue continues

3. Site Work:

a. N Miami Ave from NE 8th ST to RR Tracks – Sidewalk Closure.

• Time: 8AM to 4PM

• Duration: 07/08/19 – 07/19/19

b. NE 1st Ave from NE 6th ST to RR Tracks – Sidewalk Closure

• Time: 8AM to 4PM

• Duration: 07/08/19 – 07/12/19

4. MWC Luma

a. Installing garage production piles

b. Breaking down 888 on Monday 7/1

c. Chipping piles

d. Forming, Rebar and pouring tower foundations

e. Installing dewatering equipment

NOTE: All Concrete pours anticipated to start at 1am.