For your information, the following is a list of “Key” activities that will be occurring around the site over the next couple of weeks.

1. Paramount:

a. Level 7 Villas and Tennis Court Construction continues
b. Ground Level – Paver Replacement at Main Driveway

• Dates: 03/30/20 – 04/21/20
• Hours: 08:00 AM to 06:00 PM

2. D-East

3. Site Work

a. NE 8 Street from NE 1 Ave. to NE 2 Ave (North Side) – Sidewalk Closure for Paver tray Installation and repair.

• Dates: 03/30/20 to 04/10/20
• Times: 08:00 AM – 04:00 PM

4. MWC Luma

a. Tower / Garage

• Forming and pouring verticals – daytime
• Concrete Slab Pours
• FRP Verticals at Garage
• MEP Installation Underground
• Block installation at garage and tower
• Window Installation, MEP rough in and framing continues
• Temporary Hours of construction 08:00 AM to 06:00 PM